Identity area
Reference code
AU NBAC Z742-1137
Title
[Queensland Mining Council - Open cut work model] - CIT [Coal Industry Tribunal] 212 of 1992, Capcoal [Capricorn Coal Management Pty Ltd] application for extension of time to implement O/C [open cut] work model
Date(s)
- Apr 1993 - Aug 1993 (Creation)
Level of description
Item
Extent and medium
Context area
Name of creator
(1998 – c. 2009)
Repository
Content and structure area
Scope and content
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Alternative identifier(s)
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Rules and/or conventions used
Dates of creation revision deletion
Language(s)
- English